SWG designed the reconstruction of 1.75 lane miles of Shenandoah Drive from [specific starting point] to [specific ending point]. The design included comprehensive improvements such as roadway upgrades, drainage enhancements, sidewalks, pavement markings, streetlights, and sign improvements.
The City of Arlington designed the replacement of the water line. SWG coordinated and integrated the design plan with the construction plan.